 Today have to work from home during weekend for mid-day report:

 

R765 –

B side RS DW OOC due to B-point low and T-point high on cavity #07. However previous run RS DW on cav#07 is within control. Suspect due to tapping issue or measurement error                       

 

So have to arrange to measure same wafer and other cavity for further check. Next run arrange to measure RS profile. RS DW-11.47% VS SPEC=15.2%. To continue production, however next run still RS DW OOC-16.78%                                 

 

Next to perform treatment with bake and arranged next run wait for result. B side Res DW OOC after susceptor treatment. Recovered after change profile from 2,6-16 to 2,6-0 while A side profile changed from 1,3-8 to 1,4-8.

 

A side RS DR improved but DW OOC after change profiler coil . Current convert to 6B                                                

    

 

PROCESS ISSUES:                                                                

R932

Conversion from H42 to F49. Both side GR high : A side 1.14 & B side 1.17                                                             

 

Temp check A side 1096 vs 1100 degree C ; Temp check B side 1098 vs 1100 degree C                                 

 

Suggest down for maintenance to check TC/BUBBLE/H2 carrier and so on . Current maintenance attending R8B S/F issue                           

 

Due to urgency on F49 Automotive, to change Sx from 17 to 14 and continue production.  GR ~ 1.02um/min. Every run to measure thickness 1pcs, compare GR based on Center point and publish result per shift.                                               

                                                                                

                                                                               

R929

As per N3 team request to adjust H2 carrier pressure to original 1.5bar. Test run bypass HCL                                                     

  

After Replaced V22(SX pneumatic valve to bell. Arranged 1x1074 test run GR still low-1.29 um/min . Escalated result to N3 team                                             

6
$ 0.36
$ 0.36 from @TheRandomRewarder
Avatar for technician
3 years ago
Topics: Work

Comments

Great work! Keep it up dear friend even I didn't understand the other term like D OOC like this . I really slow in acronyms but you did it great job.

$ 0.00
3 years ago

haha OOC means Out of control- our industrial short form.

$ 0.00
3 years ago

Thank you so much for this now I know it ! Thank you!!