To confirm RS no drift.   Today we did many stuffs:                                            

                                                                               

<In all Auto-switch event onwards, to arrange the measurement for the GBT RS

measurement that the run is processed 3hrs AFTER A/S and 6S9 RS measurement    

that the run is processed 6hrs AFTER A/S.> E.g. 8am A/S happened, measure the

IGBT run processed at 11am and 6S9 run processed at 2pm.                  

Not sure, pls verify with Nani.                                                  

  

  •                                                                              

                                                                                

PROCESS Alignment:                                                             

                                                                               

1. For all loading issue, add the loading op ID here to track. Willaim will compile 

and share with PROD team.                                                      

                                                                               

OOC due to Loading Issue:                                                       

                                                                               

  

                                                                            

                                                                                

2. For incoming issue, need to alert to previous module / relevant stakeholders

officially by email communication.                                             

                                                                               

3. Do not use Profiler Coil for THK tuning and Do not use H2M for RES tuning.  

4. For the qual results, need to be shared thru passdown OR                    

email as official communication, not saved in common drive only.               

5. For Back Transfer process, pls be reminded that the BT THK / DW qual is only

refer to F/L result. Test run result is not being considered  <as per DPQ   

system, we still need to key TR result> and team is working on APF system to

replace DPQ system.                                                             

                                                                               

NEW                                                                            

6. For the intermittent loading issue, pls investigate the blackbox for the    

lift down timing, life up timing and standby timing. Also, to check if the     

operator did the wafer flat alignment at loading station OR at the workstation,

any PM activity for tool beside and etc. We will work out the package process  

checklist for intermittent AVI OOC <based on fishbone analysis input>.   

                                                                               

7. With immediate effect to stop any MFC Zeroing due to recent Res OOS case in 

R919.                                                                          

                                                                               

                                                                                

PROCESS ISSUES:                                                                

                                                                               

TC16K SUS 23/07 G1 Night XL                                                     

    - So far TC16KXXXX RS issue rate 50%.                                      

    - As per Wourng we increased RS sampling from 1 sample/ day to 1             

      sample/shift for TC16wwwXXXX susceptor.                                     

    - Instructed above information to EGA GUI and informed  production.                      

1
$ 4.03
$ 4.03 from @TheRandomRewarder
Avatar for technician
2 years ago
Topics: Work

Comments

Busy work make you very tired and This is Very bad for mental and physical health that's also bad for Our Future so we avoid This type of activities

$ 0.00
2 years ago