Start of the week, have to attend to major annual PM tasks.


Summary of today works are as below:

Calibrate backplane temps.

Calibrate process & backside gas 

Calibrate RF & DC power 

Remove wafer holders, clean and vacuum Load lock 

Replace Load lock door O-ring 

Dissemble Load lock rough line and vlean screen. Perform Helium leak check 

ZERO all pod MFC 

ZERO Load lock baratron 

Zero Backside Baratrons 

Set + 100 mv on all pod baratrons 

Inspect All Water-Cooling Lines to Back Plane Heaters For Wear / Leaks 

Inspect wafer handling and front end alignment 

Check load arm latch pins 

Elevator maintenance 

Vacuum controller calibration

 


As today not many issues, able to focus and complete the tasks within 3hours.