About Of padma Bridge of Bangladesh

0 13
Avatar for Raian46
3 years ago

Padma Bridge is a multi-purpose road and railway bridge under construction on the Padma River in Bangladesh. Through this, Shariatpur and Madaripur districts will be connected with the iron ore of Munshiganj, so that the north-eastern part will be connected with the south-western part of the country. For a developing country like Bangladesh, the Padma Bridge is going to be one of the biggest challenging construction projects in its history. The upper level of the two-tiered steel and concrete truss bridge will have a four-lane road and the lower level will have a single railway. 41 spans of 150 meters length have already been installed in the Padma-Brahmaputra-Meghna river basin, the largest bridge in the country is being constructed with a plan of 6.150 kilometers in length and 18.10 meters in width. [3] , The Padma Bridge will be operational by April 2022. [4]

Padma Bridge

Cross-section of the Padma Multipurpose Bridge under construction

Location 23.440 ° North 90.28 ° Carriage, train crossing Padma River Munshiganj with Shariatpur and Madaripur Official Name 1. 59.4 ft) Historic AECOM BuilderChina Major Bridge Engineering Construction Company Ltd. Construction begins December 6, 2014 Construction ends 2022 (approximately) [1] Launched April 2022 (approx.)

-1
$ 0.00
Avatar for Raian46
3 years ago

Comments