The dream Padma bridge, In Bangladesh

1 27
Avatar for Lafifa99
1 year ago

Overview of construction of Padma bridge

Overview of construction of Padma bridge

Used for implementation of Padma Bridge project: -

# Three lakh 96 thousand 18 tons of iron or steel plate.

# 1 crore 20 lakh 96 thousand 914 bricks are needed in this projeUsed for implementation of Padma Bridge project: -

# Three lakh 96 thousand 18 tons of iron or steel plate.

# 1 crore 20 lakh 96 thousand 914 bricks are needed in this project. ct.

#32 lakh 37 thousand 130 cubic meters of stone.

#The total cost of the project is Tk 30,193 crore. This information has come up as one of the Padma Bridge projects.

# Bridges Minister Obaidul Quader says some materials have been used in the construction of the Padma BridThe total cost of the project is Tk 30,193 crore. This information has come up as one of the Padma Bridge projects.

# Bridges Minister Obaidul Quader says some materials have been used in the construction of the Padma Bridgege

#The plane fare from China to America for earthquake bearing testing alone cost Rs 2 crore.

The world's largest hammer has been used to build the bridge.

# The bridge pile is 122 metThe plane fare from China to America for earthquake bearing testing alone cost Rs 2 crore.

The world's largest hammer has been used to build the bridge.

# The bridge pile is 122 meters ers

#9,400 crore for 14 km river management.

# 1,500 crore for rehabilitation.

2,800 crore for acquisition of 2,600 hectares of land.

# 1,906 crore for construction of 12 km long 8 lane connecting road9,400 crore for 14 km river management.

# 1,500 crore for rehabilitation.

2,800 crore for acquisition of 2,600 hectares of land.

# 1,906 crore for construction of 12 km long 8 lane connecting road

#Concerned people also said that there are 294 piles in the Padma bridge. The average depth of these piles is 122 meters; Which is equivalent to a 40 storey building. As the soil condition at the bottom of the river was bad, the skin had to be grouted in 61 piles of 22 pillars.

#The bridge has a total of 42 pillars. The bridge has been built on the pillars at such a height that ships of 18.3 meters height can easily pass under the bridge.

#Two thousand 114 tons of special type of microfine cement has been used.

# 1 crore 90 lakh 90 thousand 521 geo bags have been thrown in the river system.

# And 6 million pieces of concrete blocks have been laid.

#Two thousand 114 tons of special type of microfine cement has been used.

# 1 crore 90 lakh 90 thousand 521 geo bags have been thrown in the river system.

# And 6 million pieces of concrete blocks have been la6 lakh 75 thousand 819 tons of cement has been used. Usually transported as cement bags. Since a lot of cement is used in this bridge, it has been calculated in tons.

6 lakh 75 thousand 819 tons of cement has been used. Usually transported as cement bags. Since a lot of cement is used in this bridge, it has been calculated in tons.6 lakh 75 thousand 819 tons of cement has been used. Usually transported as cement bags. Since a lot of cement is used in this bridge, it has been calculated in tons.

#3 lakh 96 thousand 18 tons of steel plate and deformed bar have been used.