What we need to complete BCH community project in south sudan

0 41
Avatar for AtakahubSouthSudan
2 years ago

First round Funding (67 BCH)

34,0000$<>

We want to take this opportunity to thank BCH community for standing with the people of #SouthSudan on the funding of this project and we know this will bring Change to this country. Thanks, below is the first break down.

Break down on the first funding we got from #BCH community

The wrong constructed one that was destroyed

Buying of the plot for office

70000$

Medical for our colleague (Ayom)

3000$

Buying of materials

Cost 8000

Materials

150 white iron sheets

50 red iron sheets

360 piece of timbers(the office, store and toilet)

10 bags of nails

45 bundles of Baboo

2 Trucks of mud for mudding

Toilet cover

Transportation of office building materials from Juba to Bor.(two cars each 640$)

1280$

Labour charges

5000$

For Building the office

Building the store

Digging and building the toilet

Mudding

Farm land lease for 4 years

5000$

Clearance of the land

4000$

TOTALLING: 33280$

RECONSTRUCTION

The office was wrongly built so we destroy it and construct it and reusing some materials and bought some has follows;

CONSTRUCTION MATERIALS

4500$

50 tick poles

10 bags of nails

200 pieces of timbers(others were broken during demolition)

Truck of mud

Metallic doors(3) and windows(4)

1500$

Labour

1000$

Transportation of materials

500$

Total 6000$

General Total: 40780$ (NB: we had to borrow 10000$ to push this far after breakdown in BCH and when we have do reconstruction)

BREAK DOWN ON WHAT WE NEED TO COMPLETE BCH PROJECT IN SOUTH SUDAN..

ATAKA BCH OFFICE

The new one

CONSTRUCTION MATERIALS

80 bags of cement 2000$

Truck(small) of sand 200$

60m² ceiling board 1000$

40 boxes of tiles 1500$

Doors and windows glasses 500$

15 bags tiles cement 500$

5 rolls of chicken wire 100$

500 pieces Compound tiles 1000$

Building Labour 500$

SEWAGE TANK

40 bags of cement 1000$

Truck of aggregate stone 500$

10 pieces of wire mash 100$

300 blocks 900$

Building Labour 300$

ELECTRONIC AND POWER SYSTEM

SOLAR SYSTEM

6 solar panels 2400$

6(each 1000ah 2v) batteries 6000

Power controller 200$

Inverter 500$

Installation fees 300$

4 Rolls of wire (5mm) 400$

14 Sockets 150$

6 switches 70$

12 Moon bulbs 200$

1 Water tank 3000litres 300$

3 extension cables 50$

1 Projector 500$

1 Internet router 200$

4 funs 200$

1 white board 40$

FURNITURES

20 chairs 500$

6 office chairs 900$

8 tables 1600$

ATAKA BCH FARM

Farm land

40 rolls of fence wire 4000$

100 Poles 500$

10 bags of cement 250$

4 Water pump 1000$

3 rolls of pipes 600$

40 spades 300$

40 hoes 300$

30 rakes 225

Hiring tractor 500$

Seeds(different types of seeds) 500$

Farm workers(10) 6months 6000

Pesticides 500$

Farm Store

70 iron sheets 500$

30 poles 150$

40 timbers 500$

100kgs nails 200$

Fence making labour 500$

Tricycle petrol engine with BCH branding for mobility and transportation 2500

Total: 43635$ (138.5 BCH) +10000 Borrow(31.7bch)

All together 53635$ (170 BCH)

That the amount of funding we need to complete the BCH project in #SouthSudan

1
$ 0.10
From 1 contributor