Annual PM for machine repair
Start of the week, have to attend to major annual PM tasks. Summary of today works are as below: Calibrate backplane temps. Calibrate process & backside gas Calibrate RF & DC power Remove wafer holders, clean and vacuum Load lock Replace Load lock door O-ring Dissemble Load lock rough line and vlean screen. Perform Helium leak check ZERO all pod MFC ZERO Load lock baratron Zero Backside Baratrons Set + 100 mv on all pod baratrons Inspect All Water-Cooling Lines to Back Plane Heaters For Wear / Leaks Inspect wafer handling and front end alignment Check load arm latch pins Elevator maintenance Vacuum controller calibration As today not many issues, able to focus and complete the tasks within 3hours. Hopefully able to pay attention next time as well. details work come with concentration!